Difference between revisions of "ObjectiveMaintenanceSchedule"

From LPI Wiki
Jump to: navigation, search
(Created page with '__FORCETOC__ ==Introduction== The LPI objectives go through 3 different life cycles during maintenance and creation. They are: addendum revision redo =…')
 
(Introduction)
Line 4: Line 4:
 
The LPI objectives go through 3 different life cycles during maintenance and creation.  They are:
 
The LPI objectives go through 3 different life cycles during maintenance and creation.  They are:
  
  addendum
+
* addendum
  revision
+
* revision
  redo
+
* redo
  
 
==Life Cycles==
 
==Life Cycles==

Revision as of 16:10, 13 April 2011

Introduction

The LPI objectives go through 3 different life cycles during maintenance and creation. They are:

  • addendum
  • revision
  • redo

Life Cycles

Addendum Life Cycle

Period: quarterly


Revision Life Cycle

Period: 2.5 years


Redo Life Cycle

Period: 5 years (or as required)